Those listed below are our PROUD SatelliteGuys GOLD Sponsors!
Applied Instruments DishStore.NET glorystar.tv satelliteavgs tele-satellite.com
Have a News Scoop For Us? >>> CONTACT US! <<<

Welcome HOME to SatelliteGuys.US!


  •  » Looking for help picking a satellite company?
  •  » Need Help with your Satellite System?
  •  » Need Advice on your Home Theater Setup?
  •  » Looking for the latest industry news and rumors?

...then you have come to the right place!
DIRECTV, DISH Network, FTA Satellite, Cable TV, HDTV even 3DTV...
We Can Help! We are known as America's Satellite Information Source!
YES! I want to register an account for free right now!
p.s.: Registered members see a lot less ads! REGISTER TODAY!

Page 8 of 14 FirstFirst ... 6 7 8 9 10 ... LastLast
Results 71 to 80 of 135
  1. #71
    rocatman is online now SatelliteGuys Senior
    Join Date
    Nov 28th, 2003
    Posts
    994
    Thread Starter
    ADVERTS
    Quote Originally Posted by HDRoberts View Post
    Didn't know you were from Cleveland. Still, intersting they don't use Arianespace, either. I suspect Dish sats are too heavy for launching a second sat, thus making Ariane 5 not cost effective? How about United Launch Alliance? Typically doing government payloads, but they have done commercial now.
    I think cost is the big factor with ILS especially with Ariane. Scheduling with the United Launch Alliance with their government payloads that typically get preferential scheduling make them less attractive.


  2. # ADS
    Paying The Bills With Google Adsense Circuit advertisement
    Join Date
    Always
    Posts
    Many
     
  3. #72
    nelson61's Avatar
    nelson61 is online now Proud Staff Member Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Dec 8th, 2007
    Location
    Where it's Warm
    Posts
    1,441
    Regarding payloads. The planning documents for ILS indicate a 4-5 stage payload in excess of the 6308 kg listed in the filings for E14. Payload max is more than 6350 and less than 6400 kg.
    Attached Files

  4. #73
    rocatman is online now SatelliteGuys Senior
    Join Date
    Nov 28th, 2003
    Posts
    994
    Thread Starter
    Quote Originally Posted by nelson61 View Post
    Regarding payloads. The planning documents for ILS indicate a 4-5 stage payload in excess of the 6308 kg listed in the filings for E14. Payload max is more than 6350 and less than 6400 kg.
    Interesting find. I think there is a misnomer in what you are showing because what the chart shows is for using a Briz upper stage with 5 burns not stages which implies 5 separate rocket stages i.e., first stage, second stage ets. The 5 burns appears to be the standard number of burns used now especially after the loss of AMC-14 that only used 3 longer burns. The failure investigation concluded that the longer burns caused a thermal failure on the upper stage. They did make a design change to try to eliminate this thermal problem but ILS is still using only 5 Briz burns for its Proton missions. I still think the weight of E-14 is less than what is reported because I don't think that much propellant will be loaded onto it.

  5. #74
    nelson61's Avatar
    nelson61 is online now Proud Staff Member Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Dec 8th, 2007
    Location
    Where it's Warm
    Posts
    1,441
    They are quite specific about payload and go up to 6360 kg on their data tables. Why would anyone not load the max manuvering fuel for a 12-20 year life if the launch vehicle supports it and the manifest lists it?


    http://www.ilslaunch.com/assets/pdf/pmpg_2e.pdf





  6. #75
    rocatman is online now SatelliteGuys Senior
    Join Date
    Nov 28th, 2003
    Posts
    994
    Thread Starter
    Quote Originally Posted by nelson61 View Post
    They are quite specific about payload and go up to 6360 kg on their data tables. Why would anyone not load the max manuvering fuel for a 12-20 year life if the launch vehicle supports it and the manifest lists it?


    http://www.ilslaunch.com/assets/pdf/pmpg_2e.pdf


    One factor could be the possibility of the launch vehicle under performing its stated nominal capabilities which leaves the satellite in a lower orbit than planned or perhaps in an orbit that the satellite thrusters can't fix. There are also reasons not to fill propellant tanks to their maximum capacity because of over pressure risks. Reducing the propellant load reduces the risk of over pressurization or putting it another way, the margin that the satellite propellant system has on over pressurization is increased with a lower propellant load. In addition, it is rare that a current day satellite runs out of propellant prior to other on board failures that make it destined for a grave yard orbit. Certainly E-5 was the exception but that was because of an altitude control failure having nothing to do with the propellant system. E-4 won't run out of propellant, its batteries are spent because of the lack of solar power. E-2 had a massive electrical failure that ended its life.

    After examining the Proton Mission Planners Guide you provided, it appears on page 2-2 that the difference in perigee altitude for the Geo Transfer Orbit (GTO) is 2100 km less for a payload with a mass of 6360 kg versus onewith a mass of 5645 kg. The inclination is also greater for the higher mass payload (0 degrees inclination is what is needed for a Geostationary orbit), 31 degrees versus 23.3 degrees. Therefore the satellite itself has to do more thruster firing to circularize the orbit and remove the inclination.

    Last edited by rocatman; 09-04-2009 at 11:54 AM.

  7. #76
    digiblur's Avatar
    digiblur is offline The Uplink Report Dude Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Jun 8th, 2005
    Location
    Louisiana
    Posts
    13,039
    Not sure if this is new data but I saw this with the release date of yesterday:


    http://licensing.fcc.gov/ibfsweb/ib....nt_key=-165508




    Entire app:

    FCC INTERNATIONAL BUREAU







  8. #77
    nelson61's Avatar
    nelson61 is online now Proud Staff Member Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Dec 8th, 2007
    Location
    Where it's Warm
    Posts
    1,441
    [QUOTE=digiblur;1945719]Not sure if this is new data but I saw this with the release date of yesterday:

    The application had been filed some months ago.

    This latest action means the application is legally and technically complete. It puts it on public notice which starts the clock for final approval. I think the regulations provide something like 30 days for comments.

    Not sure what it means in regard to the letter Spectrum Five had written opposing the license.

  9. #78
    nelson61's Avatar
    nelson61 is online now Proud Staff Member Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Dec 8th, 2007
    Location
    Where it's Warm
    Posts
    1,441
    Quote Originally Posted by rocatman View Post
    One factor could be the possibility of the launch vehicle under performing its stated nominal capabilities which leaves the satellite in a lower orbit than planned or perhaps in an orbit that the satellite thrusters can't fix. ................
    They have considered that point. The complete planning document package includes the documentation for contigency launch fuel required to assure reaching final orbit (something like 45kg for 99+ probablility). Still less than the manifest weight.

    It's a large file (19 MB) and loaded with fascinating info about how the Proton system works.


    http://ilslaunch.com/assets/pdf/pmpg_r6.pdf





  10. #79
    nelson61's Avatar
    nelson61 is online now Proud Staff Member Proud SatelliteGuys Staff Member

    Proud Staff Member
    Join Date
    Dec 8th, 2007
    Location
    Where it's Warm
    Posts
    1,441
    The head bumping continues between Dish/Echostar and Spectrum Five with this latest salvo from Spectrum Five.


    http://licensing.fcc.gov/ibfsweb/ib....ent_key=745828




    A little background. Dish/Echostar contend that the Spectrum Five satellite needing coordination is a "phantom" and does not exist. Per the 2006 license, it must be launched in the next year or it loses it's license for US transmissions.

    Spectrum has to "coordinate" with Dish/Echostar also and Dish/Echostar say they have not even opened the door.

    Additonally, when the Spectrum license was granted, there was a condtion that Spectrum had to submit the gxt contours needed for analysis by date certain. They did submit gxt files, but changed their design from a 4 beam system to a twenty some beam system for that submission and never resubmitted their Schedule S to reflect the change in number of beams (making it impossible to calculate EIRP levels). I put in a request for the updated Schedule S and was told by FCC that I should request it direct from Spectrum Five and FCC can not talk about it.


  11. #80

    Help Keep SatelliteGuys For All, Click a Star and Become a Supporter! This Member did! Help Support The Site And Get Rid of the Syndicated Ads, This Member did! If you enjoy the site consider supporting it, this member did! Click a Star and become a Supporting Pub Member today!
    Join Date
    Nov 30th, 2005
    Location
    Sol 3
    Posts
    2,411
    Quote Originally Posted by nelson61 View Post
    The head bumping continues between Dish/Echostar and Spectrum Five with this latest salvo from Spectrum Five.


    http://licensing.fcc.gov/ibfsweb/ib....ent_key=745828




    A little background. Dish/Echostar contend that the Spectrum Five satellite needing coordination is a "phantom" and does not exist. Per the 2006 license, it must be launched in the next year or it loses it's license for US transmissions.

    Spectrum has to "coordinate" with Dish/Echostar also and Dish/Echostar say they have not even opened the door.

    Additonally, when the Spectrum license was granted, there was a condtion that Spectrum had to submit the gxt contours needed for analysis by date certain. They did submit gxt files, but changed their design from a 4 beam system to a twenty some beam system for that submission and never resubmitted their Schedule S to reflect the change in number of beams (making it impossible to calculate EIRP levels). I put in a request for the updated Schedule S and was told by FCC that I should request it direct from Spectrum Five and FCC can not talk about it.
    I smell "greenmail". I wonder if Spectrum Five is trying to lease the 114 slot to E*?

    "Nothing on earth can stop the man with the right mental attitude from achieving his goal; nothing on earth can help the man with the wrong mental attitude"
    -- Thomas Jefferson


    CLICK HERE TO DONATE TO THE SATELLITEGUYS SERVER FUND
    Click here for SatelliteGuys Folding@Home stats
    My Stuff
    Sony KDL-60EX701, Sony KDS-R60XBR2, Vizio VW32L, Vizio VX37L
    SuperDish converted to 1000+, D500 for 61.5, Vip 622, 211, 211, 211k, 522
    Panasonic SA-XR55, Polk R50 (2), Polk R15 (4), Polk CSi3 center, Yamaha sub
    Toshiba HD-A2, Sony PS3, ROKU HD, Samsung BD-C5500

Page 8 of 14 FirstFirst ... 6 7 8 9 10 ... LastLast

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

SatelliteGuys.US | 46 Miami Avenue | Newington, Connecticut 06111
Links monetized by VigLink