I called promptly on Feb 1st for a 622 install. Earliest date was March 5th. Told CSR at the time that I needed a Dish 1000. Called back two weeks later to confirm the date. Work order did NOT have a 1000 on it. I told them to be sure to annotate it. The CSR then informed me that my NEW install date would be a week later than the original date. I insisted that I wanted to keep the original date. Had to talk to a supervisor just to get it back.
I called two days prior to get the name of the sub and phone number. I was told that it was IMPOSSIBLE to get that info. Didn't get a call the evening prior to confirm the appointment. Started to get nervous...
Waited at home from 8am to noon. At 12:15 called DISH to find out what happened. After 10 minute hold I was told they were "on the way". Still couldn't get a phone number.
Installer arrives 2 hours later. Doesn't have a 1000 on the paperwork. Doesn't have a 1000 on the truck. None in the warehouse. Reschedule for March 10th.
Despite all my best efforts, what I feared would happen-- did. Pulling hair out now.
What will the 10th bring?
I called two days prior to get the name of the sub and phone number. I was told that it was IMPOSSIBLE to get that info. Didn't get a call the evening prior to confirm the appointment. Started to get nervous...
Waited at home from 8am to noon. At 12:15 called DISH to find out what happened. After 10 minute hold I was told they were "on the way". Still couldn't get a phone number.
Installer arrives 2 hours later. Doesn't have a 1000 on the paperwork. Doesn't have a 1000 on the truck. None in the warehouse. Reschedule for March 10th.
Despite all my best efforts, what I feared would happen-- did. Pulling hair out now.
What will the 10th bring?