My current setup is an SL5 (not SWM) on an 8' 6x6 post sunk 5' into 5 bags of cement, 5 RG6 (1 spare) in buried conduit (~6' deep, ~30' long) up to the house, connected to 4 way grounding block (bonded to ground rod) then enters the house and goes to a 6x8 multiswitch.
Today I replaced my LNB...