From the Echostar annual SEC 10K filing today:

... Satellites under Construction
We have entered into contracts to construct a number of additional satellites, including the following satellites which are contractually scheduled to be completed within the next three years.
• EchoStar XI, a Space Systems/Loral, Inc. (“SSL”) DBS satellite, is expected to be completed in 2007. However, the launch could be delayed until the second half of 2008 as a result of problems currently being experienced by the launch provider, Sea Launch. EchoStar XI is expected to provide service to CONUS from the 110 degree orbital location. This satellite will enable better bandwidth utilization, provide back-up protection for our existing offerings, and could allow DISH Network to offer other value-added services.

• Four additional SSL Ka and/or Ku extended band satellites are contractually scheduled to be completed during 2008 and 2009. They would enable better bandwidth utilization and could allow DISH Network to offer other value-added services.

• CMBStar, an S-band satellite, is scheduled to be completed during the second quarter of 2008. Provided required regulatory approvals are obtained and contractual conditions are satisfied, the transponder capacity of that satellite will be leased to an affiliate of a Chinese regulatory entity to support the development of satellite-delivered mobile video services in China.

• During January 2007, we entered into a contract for the construction of EchoStar XIV, an SSL DBS satellite, which is expected to be completed during 2009. This satellite has been designed with a combination of CONUS and spot beam capacity and could be used at multiple orbital locations. EchoStar XIV could also allow DISH Network to offer other value-added services.
We have also entered into agreements to lease capacity on the following satellites currently under construction.
• An SES Americom DBS satellite (“AMC-14”) which is currently expected to launch during late 2007, and commence commercial operation in early 2008 at an orbital location to be determined at a future date. The satellite is being equipped with transmit antennas optimized for multiple orbital locations, providing greater backup flexibility in the event certain other in-orbit satellites fail.

• A Telesat FSS satellite (“Anik F3”) which is currently scheduled to be launched during second quarter of 2007 and commence commercial operation at the 118.7 degree orbital location. This satellite could allow DISH Network to offer other value-added services.

• A Canadian DBS satellite (“Ciel 2”) which is currently scheduled to be launched during 2009 and commence commercial operation at the 129 degree orbital location, has both spot and CONUS capabilities. This satellite could be used to provide HD programming to CONUS and as additional backup capacity.
We are significantly increasing our satellite capacity as a result of the agreements discussed above and other satellite service agreements currently under negotiation. While we are currently evaluating various opportunities to make profitable use of this capacity (including, but not limited to, increasing our international programming and other services, expanding our local and HD programming, offering fixed satellite service capacity on a wholesale commercial basis (rather than direct to consumers), and supplying satellite capacity for new international ventures, we do not have firm plans to utilize all of the additional satellite ...
Link to the filing here.
 
Heh and people doubted me when i told them E11 was going to 110 ;0 Sad to see the launch date though! :(

-B
 
"A Canadian DBS satellite (“Ciel 2”) which is currently scheduled to be launched during 2009 and commence commercial operation at the 129 degree orbital location, has both spot and CONUS capabilities. "

Man, another 2 years for a solution at 129.:(
 
Well a 30 " Dish will give you a good hard lock on the 129 sat. I guess people will have to use that untill the new sat is launched in 2 years.
 
I believe the dates listed are all very conservative because it is an SEC filing. I know schedules slip but some of these dates appear to be 6 months later than previously reported.
 
Sounds like a little more power will be sliding into 110. Wonder if then have some QPSK to 8PSK conversions planned for a TP or two.
 