Hi. It will only go a couple of days and not longer. I have reset the box using the red button. Its connected to an HR-54 Thanks.
Whats your question ?Hi. It will only go a couple of days and not longer. I have reset the box using the red button. Its connected to an HR-54 Thanks.
I thought the guide on the mini goes for two weeks or a week and half?Whats your question ?
How long have you waited for the guide to populate? It can take anywhere from a couple of minutes to several hours.I thought the guide on the mini goes for two weeks or a week and half?
Likely the problem since the guide info comes from 101.Could be a satellite signal problem.
Go check you signal levels on satellite 101.
Usually resetting the genie fixes it
Sent from my iPhone using Tapatalk
It goes until 3/10. Would having the PI still hooked up to the C61k be causing it? I know the HR-54 has the PI included but I read that you could have the extra PI as a backup incase the HR-54 fails.How far does the guide go on the HR54?
You can have the PI connected even though the HR54 has one internally. It must be connected to the HR54 though, not the C61k.It goes until 3/10. Would having the PI still hooked up to the C61k be causing it? I know the HR-54 has the PI included but I read that you could have the extra PI as a backup incase the HR-54 fails.
I remember when the DTV guy installed it he said before I got the C61k they like to install the PI next to where the multi-switch was. That's in the basement. However, that was when I had the multi-switch and not the LNB that has the multi-switch built in.You can have the PI connected even though the HR54 has one internally. It must be connected to the HR54 though, not the C61k.
Personally, I think your fine with the PI connected to either of them, as long as its on the Power bypass thru the splitter.I remember when the DTV guy installed it he said before I got the C61k they like to install the PI next to where the multi-switch was. That's in the basement. However, that was when I had the multi-switch and not the LNB that has the multi-switch built in.
I said only to the HR54 since there is only one power passing port on the splitter so if it was connected to the client but the Genie was powering the lnb the PI on the client would do no good.Personally, I think your fine with the PI connected to either of them, as long as its on the Power bypass thru the splitter.
I believe the guide should go about 14 days on both.
I haven't checked the guide distance in quite awhile, but I believe it was running out about 13 days, sometime 14.
I didn't know their are two types if HR-54 installs. You can have the HR-54 with an external PI or just use the HR-54's PI. We have the HR-54 with the external PI install.I said only to the HR54 since there is only one power passing port on the splitter so if it was connected to the client but the Genie was powering the lnb the PI on the client would do no good.