Friday FTA Fun Poll 8/22/08

The cabling from the dish (es) to the receivers is.....

  • almost perfect

    Votes: 5 10.4%
  • pretty good

    Votes: 12 25.0%
  • eh...its ok

    Votes: 14 29.2%
  • its a messy neat

    Votes: 13 27.1%
  • yeesh...don't ask

    Votes: 4 8.3%

  • Total voters
    48
  • Poll closed .
Status
Please reply by conversation.
Well I have to say, my cables are not quite as bad as USDownlink, they are bundled together and taped or attached to my pole and fence. At one time I even put different coloured tape for the different runs. Too bad they faded and now you can not tell them apart. (If not for this I would of made the next selection) I still keep to my yeesh...don't ask selection.
 
Yeesh...don't ask. Well it's not undecypherable, but thank goodness for phasing [colored] electrical tape. To keep from disturbing working systems, I have a 'test harness' that I string out and utilize for temporary dish setups.
I intend to add banana jacks/plugs to the V-box and harnesses to help minimize the wear and tear on the spring bronze connectors........hopefully before they fail.
 
Last edited:
well here is my outside wire job

1. 74/79 dish...4x4 multiswitch bolted (ziptied) to the arm
2. cables from 74/79 & 119/123 dishes
3. part of the switch setup. This is under the table that the 6 foot dish sits on...from top to bottom is 4 way sat splitter for C-Band (stacked), 2x1 diseqc for basement receiver and 4x4 multi for 123/119
4. almost all of the switches
5. the 2 4x1's for bedroom and computer room
6. the 4x1 for the Coolsat 8000
7. the 4 way splitter (all ports passing...have to as stacked LNB can handle both H & V at once) and the 2x1
8. the 4x4 for 123/119
9. cables from the roof...5 of them (4 from the motorized and 1 from Starchoice)
10. where "some" of the cables come in
11 & 12. cabling from the main system under the deck
13. the hole where it goes in :) This is by the a/c pipes..I was able to get 11 cables in there once
14. the diseqcs (from the ground angle)
15. the 4x4 for the motorized (KU & DBS)

(and yes the deck needs painting) ;)
 

Attachments

  • 000_0650.jpg
    000_0650.jpg
    159.4 KB · Views: 83
  • 000_0651.jpg
    000_0651.jpg
    192.7 KB · Views: 104
  • 000_0652.jpg
    000_0652.jpg
    183.5 KB · Views: 87
  • 000_0653.jpg
    000_0653.jpg
    172.8 KB · Views: 84
  • 000_0656.jpg
    000_0656.jpg
    200.2 KB · Views: 89
  • 000_0657.jpg
    000_0657.jpg
    193.6 KB · Views: 84
  • 000_0658.jpg
    000_0658.jpg
    162.8 KB · Views: 84
  • 000_0659.jpg
    000_0659.jpg
    180.8 KB · Views: 86
  • 000_0660.jpg
    000_0660.jpg
    69.3 KB · Views: 82
  • 000_0661.jpg
    000_0661.jpg
    127.2 KB · Views: 90
  • 000_0662.jpg
    000_0662.jpg
    153.9 KB · Views: 88
  • 000_0663.jpg
    000_0663.jpg
    106.4 KB · Views: 79
  • 000_0664.jpg
    000_0664.jpg
    96.6 KB · Views: 98
  • 000_0665.jpg
    000_0665.jpg
    196.1 KB · Views: 90
  • 000_0666.jpg
    000_0666.jpg
    81.7 KB · Views: 82
I chose..."eh...its ok" mainly because as I've added stuff it hasn't stayed real neat. In the fall, when it cools off some, I'll be moving the entire dish farm anyway due to future tree growth. I'll say one thing, though, all my taped connectors are WATERPROOF 'cause we just entered Fay day 3 and everything STILL WORKS! :eek:
 
Status
Please reply by conversation.

Users Who Are Viewing This Thread (Total: 0, Members: 0, Guests: 0)

Who Read This Thread (Total Members: 1)

Latest posts