First 50ft free has been that way since late 01 early 02. As Ive said before the free mentality with what we do is all thanks to a single cable commercial that came out in 01.
Hm, I think DNS covers up to 15' of trenching so 50' seems a lot. For retail installs, we normally charge for any trenching beyond 5'. Did you see this in writing about the 50' of trenching?
First 50ft free has been that way since late 01 early 02. As Ive said before the free mentality with what we do is all thanks to a single cable commercial that came out in 01.
Actually it changed almost at the end of 02. At the same time we were unable to continue to charge for poles, eve mounts, tripods etc. Every little thing we were able to get ahead with was stripped away.