You Have To Be Kidding Me

hobojoe said:
:) i agree there should be an additional charge. but the supplies are not $30-40. the pole is $6 the ready-mix is $5 the 6" stick of re-bar is $1 and the conduit elbow (weed-waker gard) is another $3 total = $15.00. and a extra 30-45min to dig and mix. now your time at hard labor is $20/hr so $30-40 is fair for the extra work. not $75-100 that some say!

I agree with you, I have heard of installers charging 100.00 or more to sink a post, that is way outta line. I charge 40.00 for post, labor, concrete and up to 50' trenching, after 50' it is 50 cents a foot. Why rip people off?
 