Ciel 2 - ILS Site Active

Scott Greczkowski

Welcome HOME!
Staff member
HERE TO HELP YOU!
Cutting Edge
Sep 7, 2003
103,922
30,000
Newington, CT
Good news!

The Breeze M's second burn has been completed successfully.
The third burn will start in about two hours. Once the third
burn concludes, the Breeze M will shutdown and jettison the
additional propellant tank. Moments later, the Breeze M's
4th burn will begin. We'll confirm completion of the 4th
burn as soon as we have official word.
 

rocatman

SatelliteGuys Pro
Nov 28, 2003
1,053
11
The ILS blog just posted confirming the end of the 1st Breeze burn. If I remember correctly, it was the second burn that failed with AMC14 right?

The Breeze only had three longer burns for AMC-14 and because of the longer burns, something failed thermally. They did some design modifications to the Breeze upper stage but the 5 burn Breeze mission profile significantly reduces the chances of the failure that occurred for AMC-14.
 

Voyager6

*Cancelled*
Pub Member / Supporter
Lifetime Supporter
Nov 30, 2005
17,097
5,324
Wokeville
The Breeze only had three longer burns for AMC-14 and because of the longer burns, something failed thermally. They did some design modifications to the Breeze upper stage but the 5 burn Breeze mission profile significantly reduces the chances of the failure that occurred for AMC-14.
Let's keep those fingers crossed until the sat separates from the Breeze-M module. Go Ciel-2.:up
 

navychop

Reunite Pangea! Stop overfishing Panthalassa!
Pub Member / Supporter
Lifetime Supporter
Jul 20, 2005
62,639
31,082
Northern VA
It's all over around 6 p.m. ET, right? As in, final separation and satellite coasting into place?
 

Bradtothebone

SatelliteGuys Pro
Pub Member / Supporter
Sep 12, 2003
785
6
KC Area
It's all over around 6 p.m. ET, right? As in, final separation and satellite coasting into place?

That puts it in geostationary transfer orbit. The spacecraft engine will need to fire several times to make the orbit circular and zero inclination and get it to 138W for testing. This will take something like a week to 10 days.

Brad
 

Dah-Henny

SatelliteGuys Pro
May 12, 2007
3,666
346
Boone, North Carolina
Ciel II Blog

+ Down to the last burn

Posted by ILS Communications, 12:25 p.m. EST on 10 December 2008 | 0 Comments

The Breeze M has completed its 3rd and 4th burns, and the
additional propellant fuel tank has been jettisoned. The
vehicle is now in a five-hour coasting period. The 5th, and
final, burn will occur at the end of this period. The 5th burn will last about 7 minutes, and about 15 minutes after
that we will have separation of the Ciel II spacecraft.
We'll let you know the mission is complete the moment we
have confirmation.
 

navychop

Reunite Pangea! Stop overfishing Panthalassa!
Pub Member / Supporter
Lifetime Supporter
Jul 20, 2005
62,639
31,082
Northern VA
That puts it in geostationary transfer orbit. The spacecraft engine will need to fire several times to make the orbit circular and zero inclination and get it to 138W for testing. This will take something like a week to 10 days.

Brad

Thank you. I meant at that point we're past the upper stage risk, the one that has gone awry a few times.
 

HDRoberts

SatelliteGuys Pro
May 13, 2008
4,795
31
Cleveland, OH
About time. They had me worried for a little.

All that's left is one more burn to flatten out the inclination. Even if that fails, I would think it would be more salvageable than AMC-14 at this point.

Last few times I think it was a couple days before we saw the first TLE.
 

Garbage on top of screen on certain channels?

How many times have you had your ViP 622/722 replaced?

Users Who Are Viewing This Thread (Total: 0, Members: 0, Guests: 0)

Who Read This Thread (Total Members: 1)

Top