I recently had my dish relocated to install a SWM16.
Installer put the dish up on my roof along with the SWM16.
My question is if the grounding was done properly.
Dish -> (short run since SWM16 is on the roof) SWM16 -> (long run about 150 ft) SWM Splitter -> (short run around 20 ft) Grounding block with house ground
Hope this makes sense. I know normally you would ground before you go into the house but there is no grounding block outside of the house where the dish was relocated. If I left the dish where it was located, I would not have been able to run the 2nd cable into the house.
Installer put the dish up on my roof along with the SWM16.
My question is if the grounding was done properly.
Dish -> (short run since SWM16 is on the roof) SWM16 -> (long run about 150 ft) SWM Splitter -> (short run around 20 ft) Grounding block with house ground
Hope this makes sense. I know normally you would ground before you go into the house but there is no grounding block outside of the house where the dish was relocated. If I left the dish where it was located, I would not have been able to run the 2nd cable into the house.