This is DISH's list of what is included in SPI (Standard Professional Installation).
Standard Professional Installation includes:
• A pre-installation site survey.
• A signal strength test.
• Installation of dish(s), receiver(s), and connection(s) per the customer's plan agreement.
• An exterior cable run.
• Penetration of one exterior wall with necessary wiring to the receivers and televisions.
• Sealing and weatherproofing of all exterior penetrations.
• Connection of one television, one VCR/DVD player and one phone line to the receiver for single tuner configurations.
• An additional connection of a standard definition signal to a second television and VCR/DVD player that may not be located in
the same room as the receiver for dual tuner configurations.
• Integration of receivers with existing customer A/V equipment, if compatible. Upon completion of the installation, the customer's
system should operate the same as when the tech arrived.
• "DISH Approved as Compatible Accessories" as listed on DISH Portal.
• Installation of up to 150 feet of RG-6 cable.
• Wall plates, bushings and fittings, as needed.
• System peaking – obtaining an optimum signal for the best picture reception.
• Grounding of system components per National Electric Code (NEC) specifications.
• Wall fish to interior or exterior wall (may require an attic crawl). The number of receivers in the installation will determine how
many are necessary.
• MPEG-4 receivers ONLY: Installation of an appropriate HDMI or Component cable, which will provide the best picture quality
when receiver is hooked up to an SD or HD TV. .
• Home network broadband-connection for ViP® 612, ViP 622, ViP 722, ViP 722k, ViP 922 or Hopper receiver models.
• Signal access from either 110° and 119° or 61.5° and 72.7° orbital locations for all receiver models.
• Customer education on all receivers and programming.
• An 180-day installation warranty, which covers work completed during each installation.
What is included with custom installations?
Custom Installation not requiring additional fees include:
• Attic crawl
• Pole mounts with up to 50ft of trenching (trenching beyond 50ft is subject to additional fees, required at time of install)
• Eave mount
• Chimney mount
• Tripod installation
Custom work not listed here may require an additional charge, as determined by the Installer.