Can I do this leaving the rcvr on? Or should I pull the plug between each iteration? Going back and forth thru my backyard maze to unplug, replug can be cumbersome.

I will do this testing. I have a huge spool of RG-6 wire to make the test cable.
Do I need to do check switches betwen each test before checking transponders or can I just go to menu/setup/point dish and it will test without switch checking?

I will do this testing. I have a huge spool of RG-6 wire to make the test cable.
Do I need to do check switches betwen each test before checking transponders or can I just go to menu/setup/point dish and it will test without switch checking?