i Can do a 1 to 2 room install in about 1 hour...., a 3 and 4 room take 2 hours.....adding a 4*8 to any installtion takes an extra hour right off the bat.
The key to doing this and the way that I do it....."HOW WOULD I LIKE IT TO LOOK AT MY HOUSE". thats the way i make it look....
Other that the smart people on this site, you should be telling the customer what you are going to do and how you are going to do everything. You are the professional in their eyes.....
I also will tell the customer straight out that if i aint good at it, i am not going to it that way....wall fishing for one....but i will have to get the tool.
There are so many ways to do things and you just need to find the way that soots you best. Up here in North Dakota, with the snow, it slows everyone down, but we are still good. Just try not to out think what you are doing....there are times when you need to "THINK OUTSIDE THE BOX" but most of the time try not to "THINK OUTSIDE THE BOX" This is a easy job.....