Here's an update
from before:
From the left:
1m Prodelin was on 123º now looking for a new target.
80cm Fortec on 123º
180cm Fortec on 121º
90cm 3ABN on HH-90 - 74º to 129º
90cm Fortec on HH-120 - 74º to 129º
87cm ADTH on 83º
180cm Fortec on 99º
and in the background, an 8 foot Paraclypse is waiting on me to scrounge a NPRM. Or maybe there's a way to set it up without laying a whole mess of concrete in my landlords yard.
The other pic is a ready-to-use
multiswitch setup I have been working on. It's not the prettiest, but it crams a lot of stuff in a small space on a scrounged board.
Instead of using four separate 1A power supplies inside and then running four RG-6 cables to power the switches outside, I'm planning to use a 5A 24V power supply inside connected to a custom junction box on the board. There will be ferrite beads on each end of the power wires for RFI mitigation and three fewer penetrations in the door.
Dang. Wonder if I might be creating a ground loop... Old house, hot and common, no ground on AC power....