Bought an SG9120B to get one of my Ku dishes motorized. Looks as if I need to run the coax from the S10 to the motor then to the Diseqc switches according to the "manual" for the motor.
Not 100% sure on how to get everything to talk, since I have a 22K switch, 8x1 and a 4x1 switch here. Am I assuming correct to run coax to from the S10 to the motor, then run a second cable from the motor to the switches? Or should I run the motor after the 22K and the 8x1?
Not 100% sure on how to get everything to talk, since I have a 22K switch, 8x1 and a 4x1 switch here. Am I assuming correct to run coax to from the S10 to the motor, then run a second cable from the motor to the switches? Or should I run the motor after the 22K and the 8x1?